The construction of the shielding wall has been significantly delayed but is now proceeding ahead.

Once excavation for the wall footing began, it rapidly became clear that the existing building walls had no foundations of their own and therefore could not be safely dug under for the broader shielding wall foundations. The solution was to dig under small sections, pour foundations, let it set, and then repeat another small section. This involved getting new drawings from a structural engineer and additional inspections from the building inspector. We did get the building permit on July 26 and pouring of the first section of the foundation began. We now expect completion of the shielding wall by around Aug. 18, so a month has been lost here.

The floor plan below shows the DPF within the shielded room. The shielding wall is white, the capacitors blue and the electrodes and vacuum chamber are in the small white circle. The gold outline is the copper grounding plate on the floor.


Your involvement makes a big difference! Join online, or send checks payable to Focus Fusion Society, PO Box 232, South Bound Brook, NJ 08880.

Comments

For a more in depth discussion, start a thread in the forums.
There are (2) comments.



Great.  Thanks for the update!


DerekShannon's avatar

Coolest diagram since the flux capacitor!


Post a Comment

Log In to comment.
Not a member? Register.

Notify me of follow-up comments?
The world needs fusion.
Fusion needs you!


Do Stuff!
Join!

or send checks payable to:
Focus Fusion Society
PO Box 232
South Bound Brook, NJ 08880


Join:
forums
twitter
facebook
rss feed
flickr
donate
Youtube
zotero
Focus Fusion Society on LinkedIn
google